How to handle this type of Problem in Reports

To discuss Oracle Forms & Reports related technical issues.
Post Reply
RiazAhmad
Posts: 7
Joined: Wed Apr 19, 2006 12:49 am
Location: Pakistan

How to handle this type of Problem in Reports

Post by RiazAhmad »

I have the following Problem. the description with example is given below
Suppose u have 15 pieces. and u want to plan these 15 pieces within 6 six days equaly.But when u do it u have the following problem.
without rounded rounded
Qty 1 2.5 3
Qty 2 2.5 3
Qty 3 2.5 3
Qty 4 2.5 3
Qty 5 2.5 3
Qty 6 2.5 3
Total 15 18
So i dont want to display figures with decimal points. but in this case i got 18 total while the actual was 15;
Thanks,
Regards,

Riaz Ahmad
admin
Posts: 2063
Joined: Fri Mar 31, 2006 12:59 am
Location: Pakistan
Contact:

Post by admin »

Pl don't consider it that you have to do it or doing with Oracle reports first do it manually on the paper and if it is possible then do let us know. As reports will also calculate on the basis of data provided. thanks