I have the following Problem. the description with example is given below
Suppose u have 15 pieces. and u want to plan these 15 pieces within 6 six days equaly.But when u do it u have the following problem.
without rounded rounded
Qty 1 2.5 3
Qty 2 2.5 3
Qty 3 2.5 3
Qty 4 2.5 3
Qty 5 2.5 3
Qty 6 2.5 3
Total 15 18
So i dont want to display figures with decimal points. but in this case i got 18 total while the actual was 15;
Thanks,
Regards,
Riaz Ahmad
How to handle this type of Problem in Reports