How to remove report schedule
Posted: Thu Apr 17, 2008 1:09 am
I have scheduled a report to run after every 2 days. Now i want to cancel the schedule, How can i, Please guide me.
You love we care since 2006 by Malik Sikandar Hayat.
https://erpstuff.com/