need help in change GL Date from back end
Posted: Thu Feb 05, 2009 6:08 am
Hi Friends,
Actually there was a group Id stucked in GL_Inerface due the period is not in open status (NOV-08).
One of my friends adviced me to change the GL Date as current period (FEB-09) at GL_Interface table, then you can import the journals in current period.
So, can anybody please provide me the sql script that how to change the GL Date [@] GL_INTERFACE table?
Thanks in advance,
Prakash
dvsprao108[@]gmail.com
Actually there was a group Id stucked in GL_Inerface due the period is not in open status (NOV-08).
One of my friends adviced me to change the GL Date as current period (FEB-09) at GL_Interface table, then you can import the journals in current period.
So, can anybody please provide me the sql script that how to change the GL Date [@] GL_INTERFACE table?
Thanks in advance,
Prakash
dvsprao108[@]gmail.com